What are the next steps to prepare for home charging?

Step 1: Contact GE Smith Electric: Providing as much information as possible at this point will greatly assist in the process. Include your installation timeline, installation type (NEMA 14-50 or Wall Connector) and parking situation.

Step 2: Site visit and estimate.

Step 3: Installation After determining the scope of work and cost, we will put together a set of plans to obtain a permit from the local building department. Once a permit is obtained, work can begin. The installation itself typically takes less than a day, although some larger projects may require a return visit.

 

GET STARTED TODAY!
Schedule a home visit from GE Smith Electric Inc, get a quote and all of your questions answered by one of our experts.

CALL 856-916-9070 TODAY!

REQUEST FREE ESTIMATE